- Roof Covering for Your Loft Conversion
Phase 4 · Structure · Task 05 of 07
Roof Covering for Your Loft Conversion
What goes on the roof once the structure is built: tiles, flat roof membranes, lead flashing, dry ridge, fascia, soffits and guttering, plus a pre-payment checklist.
Tiles are the easy bit. Any half-competent roofer can hang tiles and nail slates. What separates a roof that stays watertight for 50 years from one that leaks within 18 months is the stuff nobody photographs for Instagram: the lead flashing at abutments, the soakers under every tile course where roof meets wall, the patination oil that prevents white carbonate staining, and the dry ridge clips that stop ridge tiles lifting in a gale. Ten out of fourteen forum threads analysed for this guide were about leaks at the junction where extension roof meets existing house wall. The tiles were fine. The flashing wasn't.
Your roofer's job is to turn the bare timber frame (covered in breathable membrane from the roof structure stage) into a fully watertight envelope. Once that's done, your electrician, plumber, and plasterer can start work in a dry space. The weather stops being your enemy. But if the covering is rushed or the details are wrong, you'll be chasing leaks for years.
Do this first
Your roof structure must be complete with breathable membrane installed and inspected by building control before the roofer starts. If you have roof windows (Velux or similar), they should be on site before tiling begins. The roofer needs to tile around them, and the window manufacturer's flashing kit integrates with the tile courses. Missing windows means the roofer either leaves gaps (weather risk) or tiles over the opening (rework).
What this guide covers
- 01Choosing Your Covering: Pitched Roof
- 02Choosing Your Covering: Flat Roof
- 03Battens, Counter-Battens, and the Standards That Apply
- 04Lead Flashing: Where 90% of Extension Roof Leaks Start
- 05Dry Ridge and Dry Verge: Why Mortar No Longer Counts
- 06Fascia, Soffit, and Bargeboards
- 07Guttering and Rainwater
- 08The Roofer-Window Junction Problem
- 09What Building Control Checks
- 10What It Costs
- 11The Pre-Payment Inspection Checklist
- 12Timeline
- 13Building Regulations That Apply
- 14Common Problems and How to Spot Them
- 15What Comes Next
Premium content — unlock with an Access Pass
This guide is part of the buildwiz.uk Access Pass. Get full access to every project guide, planning through to completion.
Get Access Pass£49, paid once. 24 months access.
Already bought the Access Pass? Sign in
General guidance for homeowners in England (and Wales where we say so), not professional advice. Every site is different: check anything that affects your build with a qualified professional, your local council or building control. Terms
Frequently asked questions
Reference guides for this task
Free guides to the tools, materials and terms this step involves.
Tools
Materials
- Bargeboard
- Breathable Roof Membrane
- Chopped strand mat
- Clay Roof Tiles
- Concrete Roof Tiles
- Counter-battens
- Downpipe
- Drainage
- Dry Ridge System
- Dry Verge System
- EPDM contact adhesive
- EPDM Rubber Membrane
- EPDM seam tape
- EPDM water-based bonding adhesive
- Fixings
- GRP edge trim
- GRP Fibreglass Flat Roof System
- GRP polyester resin
- GRP topcoat
- Guttering
- Hip Tiles
- Insulation
- Lead Flashing
- Lead Soakers
- Lead Wedges
- Lead-free flashing
- MEKP catalyst
- Nails
- OSB (Oriented Strand Board)
- Patination oil
- Pitched roof window
- Plasterboard Standard (12.5mm)
- Proprietary vapour control membrane
- Ridge Tiles
- Roof Window Flashing Kit
- Roofing
- Roofing Battens
- Site Protection
- Termination bar
- uPVC Fascia
- Ventilated Soffit Board