Roof Windows and Rooflights

Specify, order and install roof windows correctly. Covers Part L U-values, Part F ventilation, membrane grade, lead flashing and the pre-scaffold inspection.

12 min readUpdated 2026Premium

The roof windows go in, the tiles go back on and the scaffold comes down. Then it rains, and a damp patch appears at the corner of a new window.

Leaks at roof window junctions are among the most common defects on a loft conversion, and among the most avoidable. The window itself is rarely at fault. The cause is what surrounds it: a flashing kit for the wrong tile profile, membrane not dressed into the window's collar, or lead work nobody finished. Choose the windows early, because their sizes set where the rafters are trimmed, and check every one from the scaffold before it comes down.

What this guide covers

  1. 01Why Rooflights, and When You Need Them
  2. 02Fixed vs Opening: Which Do You Need?
  3. 03Standard Roof Windows vs Bespoke Rooflights: Two Different Products
  4. 04BCO Glazing Requirements
  5. 05The Membrane: Where Most Roof Window Failures Start
  6. 06Lead Flashing Is a Separate Trade
  7. 07Order Before Structure Starts
  8. 08Installation Sequence
  9. 09Inspect Before the Scaffold Comes Down

Premium content: included with an Access Pass

This guide is part of the buildwiz.uk Access Pass. Get full access to every project guide, planning through to completion.

Get Access Pass

£49, paid once. 24 months access.

Already bought the Access Pass? Sign in

General guidance for homeowners in England (and Wales where we say so), not professional advice. Every site is different: check anything that affects your build with a qualified professional, your local council or building control. Terms

Frequently asked questions

Reference guides for this task

Free guides to the tools, materials and terms this step involves.