Approved Document P: Electrical Safety
The electrical safety section of the Building Regulations for England and Wales. In England (since April 2013, regulation 12(6A) of the Building Regulations 2010) makes three kinds of work notifiable: a new circuit, a consumer unit replacement, and any addition or alteration to existing circuits in a special location, meaning the zone around a bath or shower or a room with a swimming pool or sauna. Kitchens and outdoor areas are not special locations in England; Wales keeps a wider scope that includes kitchens and outdoors. Compliance must be certified either by a competent-person-scheme registered installer (such as NICEIC or NAPIT), a third-party certifier, or by direct building control notification before work starts. Non-compliant work becomes a legal issue at sale, mortgage and insurance time, not just a technical breach.
Also known as
What Part P requires for a home project
The Part P requirements and terms the buildwiz guides rely on, with paragraph references where the document gives one. Check the current edition on gov.uk before you build to it.
Limits and figures
- Macerator electrical connection fuse rating
- Saniflo guides require the unit to be wired into a fused, unswitched, fixed wiring connector with a 5 A fuse and not connected to a conventional plug and socket. Whether the spur is notifiable under Part P depends on how it is run (new circuit, or alteration in a special location); the electrician decides and certifies.
- Part P electrical notification period
- Period within which a registered competent-person (Part P) scheme electrician must notify Building Control of notifiable electrical work. The notification comes via the scheme (NICEIC, NAPIT, STROMA etc.) rather than directly from the homeowner.
- Part P special location extent around a bath or shower
- The space around a bath or shower treated as a special location for Part P notification purposes, as printed in Approved Document P. Additions or alterations to existing circuits within it are notifiable.
- Part P: EIC issue window for notifiable work
- Window for self-certified notifiable electrical work: within 30 days of completion the competent person scheme notifies building control and gives the occupier a Building Regulations compliance certificate (Approved Document P para 3.4). The Electrical Installation Certificate itself goes to the person who ordered the work when it is complete, with no statutory day count.
Terms explained
- BS 7671
- IET Wiring Regulations for electrical installations. Approved Document P identifies BS 7671 as a means of demonstrating electrical safety. The summaries below explain selected topics using the listed technical guidance; electricians must use the current edition for design and verification.
- Building Regulations compliance certificate (electrical)
- The certificate a competent person scheme issues for notifiable electrical work, given to the occupier and passed to building control within 30 days of completion (Approved Document P para 3.4). It is separate from the BS 7671 Electrical Installation Certificate, which the installer gives to the person who ordered the work.
- Competent person scheme
- Government-authorised schemes that let registered installers self-certify notifiable building work without a separate building control application: for example Gas Safe Register for gas appliances, NICEIC or NAPIT for electrical work under Part P, and APHC, OFTEC or HETAS for heating, hot water, oil and solid-fuel appliances.
- Conduit
- PVC tubing used to protect cables routed through or across walls. Oval conduit is used for cables chased into masonry walls; round conduit for surface-mounted runs. Cables in conduit are protected from accidental damage from nails and screws.
- Consumer Unit
- The main electrical distribution board that houses the RCD(s), MCBs and RCBOs protecting individual circuits. Since 1 January 2016, new and replacement domestic consumer units must have a non-combustible enclosure (in practice usually steel) or sit in a non-combustible cabinet (BS 7671 Regulation 421.1.201). A 12-way or 16-way unit is typical for an extension; the electrician will specify the size needed based on the number of circuits.
- Crimping Tool
- A tool for compressing crimp connectors onto the ends of electrical cables, creating a secure mechanical and electrical connection. Used for joining cables, attaching ring terminals, and making connections in consumer units.
- Earth sleeving (green/yellow PVC)
- Green/yellow PVC tube slipped over the bare copper CPC at every termination point in twin-and-earth cable installations. Sold in rolls. Essential consumable for first fix electrics.
- Electrical handover pack
- Full documentation bundle from electrical work completion: EIC, Part P notification certificate, circuit schedule, and product warranties. Required for building control sign-off, insurance claims, and house sales.
- Electrical Materials
- Cables, consumer units, protective devices, back boxes, faceplates and conduit used in domestic electrical installations. All electrical work in extensions must comply with Part P of the Building Regulations and be certified by a registered electrician.
- Electrical Tools
- Tools for testing, preparing, and connecting electrical cables and fittings. Note: electrical work on an extension must be done or certified by a Part P qualified electrician, but understanding the tools helps you communicate with your electrician and do minor tasks.
- Gas Supply Pipe 22mm
- 22mm copper, steel or corrugated stainless steel (CSST) gas supply pipework for domestic boiler and hob connections. Push-fit plastic is prohibited for gas. Check the boiler and CSST makers' instructions for any rigid copper section required at the boiler connection.
- Heat-Shrink Tubing
- Plastic tubing that shrinks to a tight fit when heated with a heat gun, used in electrical work to insulate, protect, and waterproof wire joins, terminals, and connections. Common heat gun application at 120–180°C. Available in multiple diameters and shrink ratios. Using a lighter or match risks burning the tubing: the heat gun gives controlled, even heat.
- Immersion Heater
- An electric resistance heating element screwed into a boss on a hot water storage cylinder, used to heat water directly when the boiler is not running. Standard element is 3kW at 240V, wired on a dedicated radial circuit in 2.5mm² twin-and-earth, usually on a 16A device (20A only where the cable's installed rating allows). Isolated locally by a 20A double-pole switch (no fuse).
- LED downlight
- The dominant ceiling lighting fitting for kitchen extensions, recessed into plasterboard. Fire-rated versions required where the ceiling is beneath a bedroom or bathroom. Typical extensions specify 20-29 downlights.
- Macerator
- A small electric unit that grinds WC waste and pumps it through narrow-bore pipe to the soil stack, for a loft or basement ensuite that cannot reach a gravity drain. Approved Document G para 4.25 allows a macerator WC only where there is also access to a WC discharging directly to a gravity system, and the unit conforms to BS EN 12050-1 or -3; para 5.10 covers pumped washing appliances (BS EN 12050-2). Check the installation guide of the model you are quoted for fall, length and electrical requirements.
- Multimeter
- An electronic instrument for measuring voltage, current, and resistance in electrical circuits. Used for testing circuits are correctly wired, checking continuity, and diagnosing faults. Digital multimeters are easier to read than analogue.
- Pendant light fitting
- A ceiling-hung luminaire suspended by cable, rod, or chain, used singly over a dining area or in a row over a kitchen island. Position and drop height must be provisioned at first-fix electrical stage before the ceiling is plastered.
- Proving Unit
- A standalone device that generates a known voltage so a voltage indicator can be confirmed working before and after testing a circuit dead. HSE GS38 says the tester should be proved before and after use, preferably on a proving unit, otherwise on a known live source. Some two-pole testers have a built-in proving function.
- RCBOs
- Combined MCB and RCD in a single device, providing both overcurrent and earth-fault protection for an individual circuit. More expensive than separate MCBs and RCDs but prevent a fault on one circuit from tripping everything else. Increasingly specified in modern installations for better discrimination.
- Safe Isolation
- The formal procedure for confirming a circuit is dead before working on it. Governed by HSE GS38 and the Electricity at Work Regulations 1989.
- Smart thermostat
- Programmable heating controls (Hive, Nest, Google Nest) that require transformer wiring by an electrician, not a simple plug-and-play device in older boiler systems. One of the most common second fix extras.
- Smoke alarm system
- The fire detection and alarm system Approved Document B requires where an extension creates a new habitable room above or below the ground storey, or at the ground storey without a final exit (Volume 1 para 1.8). The minimum is Grade D2 Category LD3 (para 1.1): mains-powered smoke alarms with battery backup covering the escape route on each storey, to BS 5839-6, which also recommends interlinking.
- Socket Faceplates
- Decorative front plates for electrical sockets, available in single and double configurations. Standard white plastic is cheapest; brushed chrome, stainless steel and matt black finishes are available at higher cost. Choose a consistent style throughout the extension.
- Speaker Cable
- Two-conductor stranded copper cable used to connect amplifiers or AV receivers to passive speakers. Specified by cross-sectional area (1.5mm² for most domestic runs up to 5m; 2.5mm² for longer runs or high-power systems) and copper type (OFC oxygen-free copper vs CCA copper-clad aluminium). Run first-fix inside walls and ceilings to ceiling speaker positions.
- Special location (electrical)
- Under Part P, the room containing a bath or shower and the space around it. Any addition or alteration to an existing circuit inside a special location is notifiable, whereas an alteration to an existing circuit outside one is not (though it must still be designed, installed, inspected and tested to BS 7671). A loft ensuite creates a new special location.
- Surge Protection Device
- A protective device fitted inside or alongside the consumer unit that limits voltage spikes from lightning and switching events. BS 7671 Amendment 2 made SPDs the default requirement for new consumer unit installations.
- SWA Cable
- Steel wire armoured cable required for buried outdoor electrical circuits. Can be buried without additional conduit because the steel wire armour provides mechanical protection against digging damage.
- Switch Faceplates
- Decorative front plates for light switches, available in 1-gang, 2-gang and 3-gang configurations. Same finish ranges as socket faceplates. Dimmer versions available for compatible lighting. Two-way switching requires specific wiring for hall/landing and room entry points.
- Torpedo Level
- A compact 230-250mm spirit level with three vials (horizontal, vertical, 45-degree) that fits in a tool belt. Preferred by electricians and plumbers during first-fix work in tight spaces.
- Trace heating cable
- Self-regulating electric heating cable spiralled along exposed or vulnerable pipe runs to prevent frost damage. Output varies automatically with pipe temperature so the cable cannot overheat. Used on outdoor taps, condensate discharge pipes, and long unheated pipe runs.
- Twin-and-Earth Cable 1.5mm²
- 1.5mm² twin-and-earth flat cable used for lighting circuits. Contains live (brown), neutral (blue) and earth (bare copper, sleeved green/yellow at terminations). Sold in 100m drums. Must be run in accordance with BS 7671 wiring regulations.
- Twin-and-Earth Cable 10mm²
- Heavy-duty electrical cable required for large induction hobs over 7.4kW that need a 40A breaker. More expensive than standard 6mm² cooker cable and must be specified before first fix.
- Twin-and-Earth Cable 2.5mm²
- 2.5mm² twin-and-earth flat cable used for socket ring mains and radial circuits. The standard cable for power sockets throughout the extension. Sold in 100m drums.
- Twin-and-Earth Cable 4mm²
- Cable specified for kitchen island socket circuits where the run exceeds approximately 15m, to stay within BS 7671 Reg 525.1 voltage drop limits. Sits between standard 2.5mm² socket cable and 6mm² cooker cable.
- Twin-and-Earth Cable 6mm²
- 6mm² twin-and-earth cable for high-power circuits: cookers, electric showers and electric hobs. Thicker and stiffer than smaller cables, requiring larger back boxes and more careful routing. Sold in 50m drums.
- USB socket
- Sockets with integrated USB-A or USB-C charging ports. Available in standard finishes but cost more than plain sockets. Must be specified before the electrician orders materials.
- Voltage Tester
- A pen-shaped non-contact voltage detector (NCV pen) that senses AC voltage near a cable or socket without touching bare conductors, and beeps or lights up if voltage is present. Useful for a quick screening check, but it must never be used to prove a circuit dead: HSE GS38 says non-contact detectors are only for identifying live equipment. Prove dead with a two-pole voltage tester instead.
- Weatherproof Socket
- A socket outlet with a sealed housing and sprung or screw-down covers over the socket apertures, rated IP44 (splash-proof) or IP66 (jet-proof) for outdoor and damp locations. Required for external walls, garages, outbuildings, and covered outdoor areas. Must be supplied from an RCD-protected circuit.
- Wire Strippers
- A tool for cleanly removing the insulation from electrical cable without damaging the copper conductor inside. Adjustable types can be set to the exact cable diameter. Essential for preparing cables for connection to sockets, switches, and consumer units.
Pages where Part P comes up
24 guides reference Part P, grouped by build phase.
Planning
Pre-construction
Groundwork
Specification
Second fix
Want the full picture?
The buildwiz build guides walk through a UK extension in sequence and link to Part P (and every other Approved Document) at the exact stage it bites. That is usually a more productive way to use this material than reading the document cover to cover.