- Home
- Single Storey Rear Extension
- Specification
- Laying Out a Rear Extension: Open-Plan Living, Utility and WC Decisions Before First Fix
Phase 5 · Specification · Task 01 of 03
Laying Out a Rear Extension: Open-Plan Living, Utility and WC Decisions Before First Fix
Lay out a single-storey rear extension before first fix: open-plan zones, the utility and WC by the drains, escape and ventilation rules, and socket positions.
A planning drawing shows walls, doors and a box marked "kitchen/dining". It doesn't show where you'll sit.
That gap matters more than any finish you'll choose. The first-fix electrician wires to whatever drawing they're handed, and if there's no sofa on it, they guess where the sockets go. Every wrong guess found after plastering means cutting into a finished wall. A WC drain in the wrong place is worse: once the slab is poured over it, moving it means breaking the floor out.
The architect or designer draws the layout that goes to planning and building control, and the builder builds the shell to it. How the room gets used is your call: where the table goes, and which wall takes the TV. Make that call before first fix, not after the plasterer has been.
The rules below are for England. Wales has its own Approved Documents and Scotland uses Technical Handbooks.
Do this first
The openings come first. Door and window positions are fixed by the shell (windows and doors, bifold and sliding doors), and the layout works around them. If the extension holds a kitchen, run kitchen measuring and layout from the kitchen extension guide alongside this one.
What this guide covers
- 01Draw the furniture in at scale
- 02Three zones, each working on its own
- 03The WC and utility go where the drains allow
- 04Ventilating the new WC and utility
- 05Ventilating the open-plan room
- 06Knocking through: check the escape route
- 07The fixed-position list
- 08What changing your mind costs
- 09Layout sign-off checklist
Premium content — unlock with an Access Pass
This guide is part of the buildwiz.uk Access Pass. Get full access to every project guide, planning through to completion.
Get Access Pass£49, paid once. 24 months access.
Already bought the Access Pass? Sign in
General guidance for homeowners in England (and Wales where we say so), not professional advice. Every site is different: check anything that affects your build with a qualified professional, your local council or building control. Terms
Frequently asked questions
Reference guides for this task
Free guides to the tools, materials and terms this step involves.