buildwiz.uk

Phase 6 · First Fix · Task 01 of 08

Electrical Layout Planning

How to plan your socket, switch, and lighting positions before the electrician arrives. Your room layout must be finalised first.

16 min readUpdated 2026Premium

Prerequisites

Complete these first

Get your electrical layout wrong and you'll pay to fix it twice: once to move the cables behind the plasterboard, and again to replaster the wall you just ripped open. Sockets in the wrong position, an extractor fan wired where it blocks a fitted unit, a pendant light over the wrong spot. These aren't rare problems. They're the most common first-fix failures on building projects, and every single one is preventable with a few hours of planning before your electrician picks up a drill.

This is the planning stage. The actual installation (first-fix electrics) is a separate task that happens after you've completed this exercise. You are the designer here. Your electrician executes your design. If you hand them a vague brief, you'll get a vague result.

Do this first

Your room layout must be finalised before you plan electrical positions. For kitchens, mark worktops, fitted units and appliances. For living and dining spaces, mark seating, the TV or media unit, the dining table and any fireplace. These positions shape where sockets, switches and lighting are useful; your electrician can then advise on the circuits and installation. If the layout changes after first-fix wiring is buried in the walls, you're looking at expensive rework. Don't start this until your layout drawings are complete.

What this guide covers

  1. 01Why This Is a Separate Step
  2. 02Socket Positions: Where and How Many
  3. 03Living Room and Dining Room Extensions
  4. 04Dedicated Circuits: What Needs Its Own Feed
  5. 05Lighting: Zones, Not Just Lights
  6. 06Cables in Screed: The Sequencing Trap
  7. 07The Consumer Unit Question
  8. 08: What You Must Know
  9. 09AFDDs: Recommended, Not Required
  10. 10Smart Home Pre-Wiring
  11. 11Creating Your Electrical Layout Drawing
  12. 12What Your Electrical Quote Should Include
  13. 13Common Mistakes
  14. 14What This Costs You to Plan

Premium content: included with an Access Pass

This guide is part of the buildwiz.uk Access Pass. Get full access to every project guide, planning through to completion.

Get Access Pass

£49, paid once. 24 months access.

Already bought the Access Pass? Sign in

General guidance for homeowners in England (and Wales where we say so), not professional advice. Every site is different: check anything that affects your build with a qualified professional, your local council or building control. Terms

Frequently asked questions

Reference guides for this task

Free guides to the tools, materials and terms this step involves.