First Fix Electrics: What Happens and What to Watch For
What first-fix electrics involves and the checks you must do before the plasterer arrives. Covers consumer unit placement, circuit types, Part P certification, and the communication failures that cause expensive rework.
If your electrician doesn't come back to test and certify the work, building control can't sign the loft off. A replacement electrician may want to open up finished walls and slopes before putting their name to circuits they didn't install, so make sure the person doing first fix is the person who will certify it.
In a loft, first fix means running cables from the consumer unit up through the house to every new socket, switch, light and smoke alarm, and fixing back boxes in the new stud walls. It all has to be done and checked before the insulation and plasterboard go up, because after that every change means cutting into a finished surface.
Do this first
Your electrical layout plan must be complete before first fix begins, with smoke alarm positions taken from loft conversion fire safety.
What this guide covers
- 01What First Fix Electrics Actually Involves
- 02The Consumer Unit and the 3-Metre Rule
- 03Circuit Types Your Extension Needs
- 04Who Does the Work
- 05What It Costs
- 06What to Check Before the Plasterer Arrives
- 07and Why Certification Is Non-Negotiable
- 08How Long It Takes
- 09Future-Proofing: What to Run Now
Free guide, just enter your email
The remaining 9 sections are free too: enter your email and confirm it to open them. Includes What First Fix Electrics Actually Involves, The Consumer Unit and the 3-Metre Rule and Circuit Types Your Extension Needs. We'll also email you when we publish a new blog post.
No spam. Unsubscribe anytime.
General guidance for homeowners in England (and Wales where we say so), not professional advice. Every site is different: check anything that affects your build with a qualified professional, your local council or building control. Terms
Frequently asked questions
Reference guides for this task
Free guides to the tools, materials and terms this step involves.
Tools
Materials
- Back Boxes (Metal)
- Cable Trunking
- Cat6 data cable
- Conduit
- Conduit Clips
- Consumer Unit
- Cooker connection unit
- Cooker hood
- Duct Draw Cord
- Ducting
- External Meter Box
- Fused connection unit
- Immersion Heater
- Insulation
- Kitchen Units
- MCBs (Miniature Circuit Breakers)
- Plasterboard Standard (12.5mm)
- RCBOs
- Socket Faceplates
- Speaker Cable
- Surge Protection Device
- SWA Cable
- Switch Faceplates
- Switch Fuse
- Twin-and-Earth Cable 1.5mm²
- Twin-and-Earth Cable 2.5mm²
- Twin-and-Earth Cable 4mm²
- Twin-and-Earth Cable 6mm²
- USB socket
- Weatherproof Socket