Phase 6 · First Fix · Task 01 of 04
Electrical Layout Planning
How to plan your socket, switch, and lighting positions before the electrician arrives. Your room layout must be finalised first.
Get your electrical layout wrong and you'll pay to fix it twice: once to move the cables behind the plasterboard, and again to make good the wall or slope you opened up. A socket behind where the bed has to go, a switch on the wrong side of the door, a pendant light where the ceiling slopes too low to hang one. These are common first-fix failures, and every one is preventable with a few hours of planning before your electrician starts.
This is the planning stage. The installation itself (first-fix electrics) comes after it. You are the designer here. Your electrician works to your design, so a vague brief gets a vague result.
Do this first
Fix the loft layout before you plan electrical positions: loft layout, eaves storage and ensuite settles where the bed, storage and ensuite go. Smoke alarm positions come from the fire strategy in loft conversion fire safety.
What this guide covers
- 01Why This Is a Separate Step
- 02Socket Positions: Where and How Many
- 03Living Room and Dining Room Extensions
- 04Dedicated Circuits: What Needs Its Own Feed
- 05Lighting: Zones, Not Just Lights
- 06Cables in Screed: The Sequencing Trap
- 07The Consumer Unit Question
- 08: What You Must Know
- 09AFDDs: Recommended, Not Required
- 10Smart Home Pre-Wiring
- 11Creating Your Electrical Layout Drawing
- 12What Your Electrical Quote Should Include
- 13Common Mistakes
- 14What This Costs You to Plan
Premium content: included with an Access Pass
This guide is part of the buildwiz.uk Access Pass. Get full access to every project guide, planning through to completion.
Get Access Pass£49, paid once. 24 months access.
Already bought the Access Pass? Sign in
General guidance for homeowners in England (and Wales where we say so), not professional advice. Every site is different: check anything that affects your build with a qualified professional, your local council or building control. Terms
Frequently asked questions
Reference guides for this task
Free guides to the tools, materials and terms this step involves.
Materials
- AFDD
- Back Boxes (Metal)
- Cat6 data cable
- Ceiling Rose
- Conduit
- Consumer Unit
- Cooker hood
- Fused connection unit
- LED downlight
- MCBs (Miniature Circuit Breakers)
- Meter Tails
- MICC Cable
- Pendant light fitting
- Plasterboard Standard (12.5mm)
- RCBOs
- Socket Faceplates
- Speaker Cable
- SWA Cable
- Twin-and-Earth Cable 1.5mm²
- Twin-and-Earth Cable 2.5mm²
- Twin-and-Earth Cable 4mm²
- Twin-and-Earth Cable 6mm²
- Under-cabinet LED strip
- USB socket
- Weatherproof Socket