Skip to main content
buildwiz.uk

Phase 6 · First Fix · Task 06 of 06

Insulation for Your Extension

How to get insulation right in your extension: types, U-values, building control, and what to check before plasterboard covers it all up.

15 min read£20 – £50 per m² typical1-2 daysUpdated 2026Premium

Insulation is the part of your extension that nobody sees and everybody pays for if it's wrong. Get it right and your new room stays warm with minimal heating. Get it wrong and you'll feel a cold spot on the wall for the next 30 years, wondering why one corner of the kitchen is always five degrees cooler than the rest.

The real risk isn't choosing the wrong product. PIR, mineral wool, EPS: they all work. The risk is poor installation. A 10mm gap behind a PIR board, meaning it is not pressed tight against the surface it is fixed to, can halve the of that entire wall: air circulates through the gap and bypasses the insulation. That is a separate problem from gaps between adjacent boards, which cause their own trouble (covered below). Cheap vapour barriers sweat, stain your ceilings, and rot your timbers. Rushed floor insulation the day before screeding creates an uneven base that's buried under concrete for the life of the building.

And will inspect it. If your insulation doesn't match the approved specification, or if the has gaps, the can reject the work. That means stripping off plasterboard you've already paid to have fitted. Budget for at least one specification upgrade mid-build. It happens more often than it should.

What this guide covers

  1. 01Where insulation goes
  2. 02The three insulation types
  3. 03Roof insulation
  4. 04Wall insulation
  5. 05Floor insulation
  6. 06Installation quality: where most problems start
  7. 07The BCO upgrade problem
  8. 08Timing and sequencing
  9. 09What good installation looks like
  10. 10Costs
  11. 11Scotland and other regions
  12. 12The Future Homes Standard

Premium content: included with an Access Pass

This guide is part of the buildwiz.uk Access Pass. Get full access to every project guide, planning through to completion.

Get Access Pass

£49, paid once. 24 months access.

Already bought the Access Pass? Sign in

General guidance for homeowners in England (and Wales where we say so), not professional advice. Every site is different: check anything that affects your build with a qualified professional, your local council or building control. Terms

Frequently asked questions

Is PIR or mineral wool better for an extension?

PIR boards give the best thermal performance per millimetre, so they are the usual choice where wall thickness eats into room size. Mineral wool is non-combustible and better for acoustics and irregular spaces, while EPS is a cheaper option used mainly under floors where the extra depth does not matter.

What is cold bridging where an extension meets the existing house?

It is a persistent cold strip along the wall where the new insulated structure joins the older, poorly insulated house, because heat escapes through the path of least resistance at that junction. It is the most underestimated insulation problem on extensions and can cause condensation and mould if it is not detailed.

Why does insulation have to be inspected before plasterboard goes up?

Building control checks insulation type, thickness, and continuity at the pre-plasterboard stage. Part L 2021 makes photographic evidence formal only for new dwellings, but many BCOs ask for photos on extensions too. If you board over it before that inspection, the BCO can require you to take the plasterboard back down.

Does a small gap behind an insulation board really matter?

Yes, far more than most people expect. A 10mm gap behind a PIR board can halve the thermal performance of that whole wall, which is why installation quality matters more than which product you choose.

What is a vapour control layer and why does it need to be continuous?

It is a membrane on the warm room side of the insulation that stops moist indoor air reaching the cold side, where it would condense and rot timbers. A single small hole lets through many times more moisture than the rest of the surface, so every overlap and pipe penetration has to be taped and sealed.

Reference guides for this task

Free guides to the tools, materials and terms this step involves.