buildwiz.uk

Phase 1 · Planning & Permissions · Task 11 of 15

Building Control: How to Apply and What to Expect

Building control is separate from planning permission and costs £300 – £900 for the plan check alone. Here's how to apply, what the documents contain, and realistic timescales.

15 min readUpdated 2026Free with email

Skip building control on a loft and the problem surfaces the day you sell. A buyer's solicitor will ask for the completion certificate, and without one the new rooms may not be accepted as habitable rooms at all. Putting that right afterwards means a retrospective application, which can mean opening up finished work, with no guarantee it succeeds.

A loft conversion needs building regulations approval even when it is permitted development and needs no planning application. The approval covers the new floor, the stair, fire safety and insulation, so get it in place before the joists go in. What building control inspects on a loft covers the site visits that follow.

What this guide covers

  1. 01Building Control Is Not Planning Permission
  2. 02Two Application Routes
  3. 03What the BC Documents Contain
  4. 04The Application Process
  5. 05What It Costs
  6. 06Conditional Approval
  7. 07When Things Change Mid-Build
  8. 08Local Authority or Private Inspector?
  9. 09The Inspection Stages Ahead
  10. 10What Happens If You Skip It
  11. 11Your Building Control Checklist

Free guide, just enter your email

The remaining 11 sections are free too: enter your email and confirm it to open them. Includes Building Control Is Not Planning Permission, Two Application Routes and What the BC Documents Contain. We'll also email you when we publish a new blog post.

No spam. Unsubscribe anytime.

General guidance for homeowners in England (and Wales where we say so), not professional advice. Every site is different: check anything that affects your build with a qualified professional, your local council or building control. Terms

Frequently asked questions

Reference guides for this task

Free guides to the tools, materials and terms this step involves.