buildwiz.uk

Planning & Permissions

Everything you need to sort before a single brick is laid

17 tasks in this phase

Illustration in progress
1
Is Your Loft Suitable for Conversion? Head Height, Roof Structure and Bats
Is your loft suitable for conversion? Measure head height properly, tell a cut roof from trusses, and check bats, asbestos risks, stair space and planning.
Free
Infographic showing the Planning Portal's role as an intermediary between homeowners and local council planning departments, with the service charge and submission flow
2
The Planning Portal: What It Is and How to Use It
What the Planning Portal does, what it costs (£149 service charge), and how it differs from your council's planning website.
Free with email
Illustration in progress
3
Loft Conversion Fire Regulations: Protected Stair, Fire Doors, Alarms and Escape
Loft conversion fire regulations: the protected stair, E 20 vs FD30 fire doors, self-closers, mains alarms, open-plan ground floors and escape windows.
Free with email
Six-stage architect pipeline infographic showing the journey from initial consultation through outline drawings, detailed plans, planning submission, building control documents, and BC submission, with typical fees and timeline at each stage
4
Finding an Architect for Your Loft Conversion
How to find, appoint and manage an architect for your loft conversion, what each design stage covers, and the questions to ask before you commit.
Free with email
Side-by-side comparison of a 1:1250 location plan and a 1:200 site plan, annotated with the required elements: red line boundary, north arrow, scale bar, and OS licence number
5
Purchasing OS Maps for Your Planning Application
Where to buy the Ordnance Survey maps required for your planning application, which scales to order, and how to avoid the location plan errors that invalidate 22% of submissions.
Free with email
Planning application timeline from submission to decision: validation, neighbour consultation, site visit, officer assessment, 8-week determination, decision notice
6
Submitting a Planning Application: The Full Process
How to submit a householder planning application in England. Covers the £548 fee, required drawings, Planning Portal submission, the 8-week decision timeline, and what to do if refused.
Free with email
The UK Planning Gateway logo on navy beside a browser window showing a garden plot outlined in red on a map, with a generated site location plan overlapping it, and three steps: draw the red line, plans in seconds, check before you pay
7
Submitting a Planning Application Through UK Planning Gateway
How to submit a householder planning application through UK Planning Gateway as a homeowner: the £85 service charge, each step, and what to check before you pay.
Free
Illustration in progress
8
Loft Conversion Stairs: Where They Go, Part K Rules, and the Room You Might Lose
Loft stairs and Part K: where the stair goes, pitch and headroom rules, the width myth, when a space saver is allowed, and standard stair costs of £1,500 – £3,000.
Free with email
Process infographic showing the structural engineer's involvement across the extension project lifecycle, from initial calculations through mid-build revisions to building control sign-off
9
What Does a Structural Engineer Do for Your Loft Conversion?
Your structural engineer designs the steels, joists and load paths the new floor and roof depend on, and produces the calculations building control checks.
Free with email
Timeline showing the neighbour conversation process from informal doorstep chat through council consultation to planning decision
10
Talking to Neighbours About Your Loft Conversion
How to discuss your loft conversion plans with neighbours before work starts. Covers what to say, what not to say, and how to handle objections.
Free with email
Triage diagram of the four channels a neighbour can act through against an extension, showing which can stop, delay, or carry no weight
11
Can a Neighbour Stop Your Loft Conversion? What They Can and Can't Do
An objection is not a veto. How to tell a toothless complaint from a real legal lever: planning objections, the Party Wall Act, right to light, restrictive covenants, and oversailing trespass.
Free
Timeline infographic showing the building control application process from document preparation through to conditional approval, with realistic durations at each stage
12
Building Control: How to Apply and What to Expect
Building control is separate from planning permission and costs £300 – £900 for the plan check alone. Here's how to apply, what the documents contain, and realistic timescales.
Free with email
Illustration in progress
13
What Building Control Inspects on a Loft Conversion, and When
Loft conversion building regs: full plans vs building notice, the stages building control inspects on a loft, who books them, and the certificates you need.
Free with email
Infographic dashboard showing extension cost breakdown by category with proportional bars, total cost range, and contingency buffer highlighted
14
Budgeting and Contingency: What a Build Really Costs
How to budget for a home building project, why builder quotes cover only part of the total, and how to protect yourself from overruns.
Free with email
Process infographic comparing the five main UK extension funding routes across speed to draw down, indicative rate band, secured vs unsecured, FCA protections, and the build size each route suits best
15
Financing Your Loft Conversion: The Real Options for Homeowners
How to pay for a UK loft conversion: further advance, remortgage, second charge or personal loan, the MCOB stress test, Section 75 protection and products to avoid.
Free with email
Three-layer regulatory stack diagram showing the bottom layer Building Act 1984 plus Building Regulations 2010 statutory instrument, the middle layer Approved Documents A through T plus AD 7 official guidance, and the top layer BS, EN, and NHBC technical standards, with a labelled arrow showing the BCO checks against the middle layer and a sub-arrow showing they drill down to the top layer when a Part is contested
16
The Standard Building Control Follows
The Building Regulations 2010 plus the Approved Documents are the standard your building control officer enforces. The full map for a home building project.
Free with email
Planning appeal timeline showing key stages from refusal through appeal submission, council response, inspector site visit, and decision
17
Appealing a Planning Decision
How to appeal a refused householder planning application. Covers the 12-week deadline, written representations procedure, what the inspector looks for, realistic success rates, and when resubmitting makes more sense.
Free with email