- Home
- Kitchen Extension
- First Fix
- Kitchen Plumbing Provisions: What to Tell Your Plumber Before First Fix
Phase 6 · First Fix · Task 07 of 08
Kitchen Plumbing Provisions: What to Tell Your Plumber Before First Fix
The full list of kitchen-specific plumbing provisions your plumber needs before first fix starts: dishwasher and washing machine stubs, boiling water taps, water softeners, ice makers, and outside taps.
Your plumber prices from a scope. If that scope misses the boiling water tap, the ice maker feed, or the water softener bypass, those become expensive extras added after walls close. A half-day becomes two days of disruption with plasterboard to repair. The first fix plumbing guide covers the mechanics. What follows here covers only what a kitchen needs.
What this guide covers
- 01Waste runs: what your plumber needs to know
- 02The full supply list: walk through every appliance
- 03Your kitchen's service void
- 04Boiling water taps
- 05Water softeners
- 06Outside tap
- 07Coordinate with the electrician at the same time
- 08The ice maker: the provision everyone forgets
- 09Put it in writing
Premium content — unlock with an Access Pass
This guide is part of the buildwiz.uk Access Pass. Get full access to every project guide, planning through to completion.
Get Access PassOne-time payment. 24 months access.
Already bought the Access Pass? Sign in
General guidance for homeowners in England (and Wales where we say so), not professional advice. Every site is different: check anything that affects your build with a qualified professional, your local council or building control. Terms
Frequently asked questions
Reference guides for this task
Free guides to the tools, materials and terms this step involves.