buildwiz.uk

Phase 4 · Structure · Task 05 of 09

Roof Windows and Rooflights

Specify, order, and install roof windows correctly for your extension. Covers Part L U-values (max 1.4 W/m²K), Part F ventilation, membrane grade, lead flashing, and the pre-scaffold inspection that prevents expensive re-work.

11 min readUpdated 2026Premium

Prerequisites

Complete this first

The roof goes on. The tiles look right. Scaffold comes down. Then it rains.

Leaks at the window junction are one of the most common post-construction defects on extensions with pitched roof windows. They're also one of the most avoidable. The failure almost never comes from a faulty window. It comes from what surrounds the window: the wrong grade of breathable membrane, a roofer who doesn't do lead work, or a flashing kit specified for the wrong tile profile. By the time you discover the problem from inside the extension, scaffold has been gone for months.

What follows covers how to specify, order, and install roof windows correctly. And the one inspection you must do before scaffold strikes to catch problems while they're still accessible.

Do this first

The roof structure must be complete with correctly sized trimmer rafters forming the window opening before your windows can be delivered and installed. Confirm the structural opening dimensions from the manufacturer's actual unit spec (not your design drawings, which may have been drawn before the window was finalised) and make sure your structural engineer has signed off the trimmer arrangement before the carpenter starts cutting.

What this guide covers

  1. 01Why Rooflights, and When You Need Them
  2. 02Fixed vs Opening: Which Do You Need?
  3. 03Standard Roof Windows vs Bespoke Rooflights: Two Different Products
  4. 04BCO Glazing Requirements
  5. 05The Membrane: Where Most Roof Window Failures Start
  6. 06Lead Flashing Is a Separate Trade
  7. 07Order Before Structure Starts
  8. 08Installation Sequence
  9. 09Inspect Before the Scaffold Comes Down

Premium content — unlock with an Access Pass

This guide is part of the Kitchen Extension Access Pass. Get full access to every section — from planning through to completion.

Get Access Pass

One-time payment. 24 months access.

Frequently asked questions