Blog: page 2
Practical guides and insights for UK homeowners managing their own builds.

Do You Need Planning Permission for a Kitchen Extension? (UK, 2026)
Often you don't. Many single-storey kitchen extensions fall under permitted development. Here are the size limits, the exceptions, and how to check yours.

Builders Insurance: What to Check Before Your Builder Starts
Builders insurance protects the builder, not you. The three covers to verify before they start, how to check a certificate, and the gap that leaves you liable.

How to Compare Builder Quotes for an Extension (Line by Line)
Why extension quotes never match, and how to compare builder quotes properly: normalise scope, provisional sums, exclusions and VAT before trusting a total.

Builder Deposits and Stage Payments in the UK: What's Normal, What's a Red Flag (2026)
Typical UK builder deposits run 10-20%. Stage payments are tied to milestones, with 5% retention held back. Here is what should be in your contract and the warning signs to walk away from.

UK Building Measurements: Why a 4×2 Isn't 4 Inches by 2 (And Other Imperial vs Metric Traps)
A homeowner's decoder for UK building measurements. Why timber, pipes, bricks, and bags use mixed imperial and metric, what to actually order, and the US import traps that wreck extensions.

First Fix vs Second Fix: What You Need to Know Before Your Extension
First fix and second fix explained for UK extension homeowners: what each stage covers for electrics, plumbing, and carpentry, and the decisions you must lock in before cables are run.

Justifying the Builder Deposit: A Worked Example with Real Numbers
An £80k extension with a 15% deposit means handing over £12,000. Here is what that money actually pays for in week one, with real invoice data.

Lessons from a 35-Month Kitchen Extension: What I'd Do Differently
Real lessons from a UK kitchen extension that took 35 months and cost £181,916 against a £45,500 builder quote. First-person account with invoice-level detail.

How to Project Manage Your Own Extension (and Whether You Should)
Real numbers from a 35-month UK extension the owner project managed: what it saves, what it costs in time, a step-by-step plan and a decision framework.
