- What Does a Structural Engineer Do for Your Extension?
Phase 1 · Planning & Permissions · Task 09 of 18
What Does a Structural Engineer Do for Your Extension?
Your structural engineer calculates the steels, foundations, and load paths that stop your extension falling down. Expect to pay £600 – £2,200 for initial calcs, plus £45 – £135 per revision.
When you remove the rear wall of your kitchen to open up into the new extension, the only thing stopping the bedroom above from dropping through the floor is a steel beam. Your structural engineer is the person who works out exactly what size, type, and position that beam needs to be. Get the calculation wrong, and your house is structurally compromised. Get it right, and nobody ever thinks about it again.
That makes this one of those roles where the value is invisible. You'll pay £600 – £2,200 for some paperwork and wonder what you got for it. What you got was a house that stays standing.
What a Structural Engineer Actually Does
An architect designs the space you want. They decide where walls go, where windows sit, how big the opening to the garden will be. A structural engineer works out whether the building can physically support what the architect has drawn. They're solving a different problem entirely.
For a typical single-storey extension, the SE calculates:
- Steel beam sizes for supporting the existing first floor where you're removing or cutting through load-bearing walls. These are specified by their Universal Beam designation (e.g. "305 x 102 x 33 UB"), which tells the fabricator the exact dimensions and weight per metre.
- Lintel sizes over new openings, including windows, external doors, and bifold doors.
- Foundation depth and width, based on soil conditions, tree proximity, and the loads the walls will carry.
- Roof structure adequacy, confirming that timber sizes, spacing, and connections can handle wind, snow, and dead loads.
- Any unusual structural features, such as cantilevers for corner-post removal or long-span beams for full-width glazing.
The SE doesn't design your project. They prove it won't collapse.
Do You Need a Separate Structural Engineer?
Not necessarily. Some architects (particularly architectural technologists with structural experience) produce their own structural calculations. Others subcontract to an independent SE and pass the cost through. You need to know which arrangement you're getting before you appoint.
| Architect handles SE calcs | Independent SE | |
|---|---|---|
| Cost | Bundled into architect fees | £600 – £2,200 |
| Communication | Single point of contact | You coordinate between two professionals |
| Speed | Faster turnaround (no handoff) | 1-3 weeks for initial calcs |
| Expertise depth | Good for standard extensions | Better for complex structures (cantilevers, large spans) |
| When to choose | Simple rear extension, standard openings | Bifold doors, corner-post removal, two-storey, unusual ground |
If your architect produces structural calculations in-house, ask whether they carry professional indemnity insurance covering structural work. An independent SE should hold their own PI insurance (it is a policy they buy, not something that comes with IStructE or ICE membership), so ask to see it.
For a straightforward single-storey rear extension with standard openings and foundations, your architect can usually handle the calcs. But if you're removing corner posts or installing full-width bifold doors, get an independent SE. Same applies if you're dealing with unusual ground conditions or going to two storeys.
What this guide covers
- 01What You Actually Receive
- 02The Revision Problem
- 03What It Costs
- 04How to Appoint a Structural Engineer
- 05From Calculation to Fabrication
- 06When the BCO Disagrees
- 07The Communication Chain
- 08When Design Changes Hit Structure
- 09What Happens After the Calculations
Free guide, just enter your email
The remaining 9 sections are free too: enter your email and confirm it to open them. Includes What You Actually Receive, The Revision Problem and What It Costs. We'll also email you when we publish a new blog post.
No spam. Unsubscribe anytime.
General guidance for homeowners in England (and Wales where we say so), not professional advice. Every site is different: check anything that affects your build with a qualified professional, your local council or building control. Terms