Plumbing Budget Calculator
Estimate your total plumbing spend for a UK kitchen extension: first fix, second fix, boiler work, underfloor heating, and add-ons. Calibrated against a real £10,400 plumbing quote that was finally paid at £9,695.
Premium calculator — unlock with an Access Pass
This calculator is part of the Kitchen Extension Access Pass. Get full access to every calculator, guide, and tool — from planning through to completion.
Get Access PassOne-time payment. 24 months access.
Plumbing for a UK kitchen extension usually costs £8,000 – £18,000 once boiler work is part of the job. Take the boiler out and the first fix plumbing on its own, the buried supply and waste pipework, is typically £4,000 – £7,000. This calculator turns those broad ranges into a figure built around your actual scope: the boiler decision, whether you are laying underfloor heating, how many bathrooms are served, and each outlet you want plumbed.
The estimate splits into two stages, because that is how a plumber quotes and invoices. First fix is the pipework buried in walls and floors before plastering. Second fix is the visible work at the end: taps, waste traps, appliance connections, and commissioning the boiler. Add-ons like a boiling water tap sit outside both stages and are usually priced on their own.
Where the money goes
The boiler is the biggest single variable. A new combi boiler, supplied and installed by a Gas Safe registered engineer, is usually £2,000 – £3,500 at second fix, on top of the first-fix gas service and roughing-in. Relocating an existing boiler instead costs £500 – £2,800, driven by distance and whether gas and water runs have to be extended. If no boiler work is needed at all, this whole line drops away and the estimate falls sharply.
Beyond the boiler, most of the cost is the plumber's labour running supply and waste to each point. Pipe and fittings themselves are cheap. Adding underfloor heating brings a per square metre charge for the pipe loops and manifold connection, which is first-fix work that has to go in before the screed is poured. Each bathroom on the scope adds its own supply and waste rough-in at first fix and fixture connections at second fix.
The add-ons that quietly grow the bill
The line items that catch people out are the ones a standard quote leaves off. A boiling water tap runs £1,400 – £2,900 for a basic model and up to £3,500 – £5,500 for a version with a chilled and sparkling unit. A water softener, unit plus professional installation, is around £475 – £2,150. An outside tap is £80 – £150, and it needs a double check valve under the Water Supply (Water Fittings) Regulations. None of these are usually inside the main plumbing contract, so specify everything upfront and get written confirmation of what is and is not included before work starts.
A worked example
Take a 30m² kitchen extension with a new combi boiler, wet underfloor heating across the open-plan floor, a kitchen sink and dishwasher plumbed in, and a boiling water tap.
The new combi drives the largest lines: the second-fix supply and installation at £2,000 – £3,500, plus its first-fix gas service and pipework. The underfloor heating adds a per square metre charge for loops and manifold across the heated area. The sink and dishwasher each add a supply run and waste connection at first fix and their final connections at second fix. The boiling water tap is a separate add-on at £1,400 – £2,900 for a basic unit, more if you choose the chilled and sparkling model.
The calculator folds these into the first fix and second fix totals shown above and gives a headline plumbing budget. For a project with boiler work, that headline lands inside the £8,000 – £18,000 full-scope range. A documented real kitchen extension with a new boiler, underfloor heating, a softener, and a boiling water tap came in near the lower half of that range, so treat the middle of the range as a sensible planning figure and hold a buffer for the add-ons that appear late.
One last point on the boiler: gas work must be certified for building control sign-off, and the engineer has to notify the Gas Safe Register within a set window of finishing the installation. On one real project the paperwork, not the pipework, held up the completion certificate for over a year because the engineer never filed the notification. Chase that certificate from day one and withhold the final payment until you have written proof it has been done.
Where this fits in your build
The tasks, tools and materials this cost covers.
More calculators
Other free tools for this stage of your extension.
UFH and Screed Cost Estimator
Estimate the cost of liquid or traditional floor screed — and optional underfloor heating system — for your extension floor area.
Screed Drying Time Calculator
Calculate how long before you can walk on your screed, commission underfloor heating, and tile over it.
Electrician Budget Calculator
Estimate the full electrical budget for your kitchen extension: first and second fix labour, fittings, consumer unit work, outdoor lighting, smart home additions, and certification.
Frequently asked questions
Doing the whole extension yourself?
Get the free budget spreadsheet. Every cost category for a UK kitchen extension, with contingency and cost per m² worked out for you.
Get the free spreadsheetWant the full step-by-step guide, planning through to completion? See the Access Pass