Screed Drying Time Calculator

Calculate how long before you can walk on your screed, commission underfloor heating, and tile over it.

Premium calculator: included with an Access Pass

This calculator is part of the buildwiz.uk Access Pass. Get full access to every calculator and project guide, planning through to completion.

Get Access Pass

£49, paid once. 24 months access.

Already bought the Access Pass? Sign in

A standard 50mm usually needs before you can tile over it, and the true green light is a hygrometer moisture test rather than a date on the calendar. This calculator turns your screed type, thickness, and pour season into a realistic drying timeline: when you can walk on it, when you can commission underfloor heating, and when the floor is ready to tile.

Enter your details above and the tool applies the published drying rates (BS 8204 for sand-and-cement, the screed manufacturers' data for anhydrite) for your screed and depth, then flags the moisture test you still have to pass before any flooring goes down.

How screed drying time is worked out

Screed does not dry at a constant rate all the way through. The top layer dries first, then moisture from deeper down has to migrate up through a thickening dry crust, so each extra millimetre takes longer than the last.

For a liquid anhydrite screed the first 40mm dries at about , and every millimetre above 40mm dries at roughly . Traditional sand-and-cement screed follows the same pattern with the step at a slightly greater depth: for the first 50mm, then for the depth beyond it. Those depths are fixed points from BS 8204 and the screed manufacturers' data, not adjustable settings, which is why the calculator asks for thickness rather than letting you tune the rate.

All of these figures assume good drying conditions: around 20°C, low relative humidity, and steady ventilation. A winter pour dries far more slowly, so the calculator adds a cold-weather penalty when you tell it the screed went down in winter.

Two hold points before the floor is finished

Drying to tiling is not the only wait. Two earlier milestones matter for sequencing the rest of your build.

The first is and light foot traffic. You can usually step onto a liquid screed after , but that only means it will take your weight. It is nowhere near dry.

The second is underfloor heating. Before you begin the , wait at least for anhydrite or for sand-and-cement. Then ramp the flow temperature up in stages across the following few weeks. Switching the heating straight to full temperature cracks or delaminates the screed.

A worked example

Take a 50mm liquid anhydrite screed poured over underfloor heating in spring. The first 40mm dries at and the last 10mm at , and the calculator sums those to the day count shown at the top of the page. That number reflects ideal conditions, but real extensions are draughty and rarely sit at a steady 20°C, which is why the sensible planning window is .

Along the way you can walk on it after , and you can start commissioning the underfloor heating from . None of that lets you tile early. Book a hygrometer test with your and only lay tiles once the reading is below the British Standard threshold. Time is a guide; the moisture reading is the decision.

The tasks, tools and materials this cost covers.

More calculators

Other free tools for this stage of your extension.

Frequently asked questions

How long does liquid screed take to dry before tiling?

A standard 50mm liquid anhydrite screed usually needs 8-12 weeks in real UK site conditions. The rule of thumb is 1mm/day for the first 40mm of depth and 0.5mm/day for the depth above that. The calculator adds those together for your thickness, but a hygrometer moisture test, not the calendar, is the real green light.

When can you walk on a new screed?

Light foot traffic is usually fine after 24-48 hours. No heavy loads, no wheelbarrows, and no stacking materials on the surface until the screed has properly set. Walking on it does not mean it is dry enough to tile.

How long before you can turn on underfloor heating over screed?

Wait at least 7 days for an anhydrite screed, or 21 days for sand-and-cement, then follow the commissioning ramp. Firing the heating up too early causes thermal shock and cracking. The heat helps dry the screed but never replaces a moisture test before tiling.

Does traditional sand-and-cement screed dry slower than liquid?

Per millimetre the rates are similar: 1mm/day for the first 50mm and 0.5mm/day above that. In practice sand-and-cement floors are poured thicker than liquid ones, so the overall drying time is often longer. Thickness is the biggest single driver, which is why the calculator asks for it.

Can you tile based on time alone?

No. The day count assumes ideal conditions, roughly 20°C with low humidity and steady ventilation. A calibrated hygrometer left sealed against the screed is the only British Standard way to confirm the floor is dry enough. Tiling over a screed that is still wet leads to lifting tiles and failed adhesive.

Why does winter make screed take so much longer to dry?

Cold, damp air holds far less moisture, so it draws water out of the screed much more slowly. A winter pour can take considerably longer than a summer one, and the calculator adds a cold-weather penalty when you select winter. Keep the building warm and run a dehumidifier to claw some of that time back.

Doing the whole extension yourself?

Get the free budget spreadsheet. Every cost category for a UK kitchen extension, with contingency and cost per m² worked out for you.

Get the free spreadsheet

Want the full step-by-step guide, planning through to completion? See the Access Pass