Utility Relocation Cost Estimator

Estimate the cost of moving gas, electric, and water meters before your extension build. Includes trenching and consumer unit moves.

Premium calculator: included with an Access Pass

This calculator is part of the buildwiz.uk Access Pass. Get full access to every calculator and project guide, planning through to completion.

Get Access Pass

£49, paid once. 24 months access.

Already bought the Access Pass? Sign in

Moving gas, electric, or water meters for an extension usually costs per meter for a short move along an external wall, and around once you add trenching and a consumer unit move to a gas and electric job. This estimator turns your specific choices, which utilities move, how far, and whether groundwork is involved, into a realistic range you can budget against.

The bigger risk with utility meter relocation is not the cost. It is the time. The supply pipes and cables are moved by regional monopolies and the meters by your energy supplier or the gas network, never by your builder or by you, and they all run to their own calendars. Allow from first contact to the meter being moved, and start the process the day planning permission lands.

Why five companies get involved

A meter move is rarely one phone call. Your owns the gas supply pipe and is the only party allowed to move it. Your owns the electricity cable from the street to the meter. Your moves the electricity meter itself; the gas meter is refitted either by your supplier's meter operator or by the gas network as part of its alteration, so ask the network which applies. Add a Gas Safe engineer to reconnect internal pipework and a groundworker to dig the , and you are coordinating up to five parties for one job.

Two constraints catch people out. Network operators will not work while scaffolding is up, so the forces the meter box into the wall during blockwork, before the scaffold goes on. And quotes come with a fixed acceptance window, so the means a slipping build can force a fresh survey and a fresh charge.

What drives the number up

Distance is the first lever. The base figures assume a short move; every metre beyond that adds a per-metre charge from the network operator, and gas, electric, and water each carry a different rate. Trenching is the second. If the supply pipes have to be rerouted underground to new positions, the groundwork alone can run into the low thousands, and whoever digs it must be agreed in writing before the move date rather than assumed.

The third is the . When the electricity meter moves far enough, the consumer unit usually has to follow it, which brings a registered electrician onto the job at . The alternative is a switch fuse beside the meter feeding the board.

A worked example

Take a rear extension where both the gas and electric meters sit inside the new footprint and have to move roughly six metres to a new external wall. Both network operators charge for the move, the extra distance adds a per-metre uplift on each, a groundworker digs the trench for the rerouted supplies, and the meter shift breaches the three-metre rule so the fuse box relocates too at .

Add those lines together and a gas-plus-electric job of this shape lands around , which is where the calculator's central estimate falls once you enter your own distance and options. Its full range is wider, because each network charge, the trench and the fuse box move can each come in at the bottom or the top of its own range. Before you accept anything, if you have a prepayment meter, check whether a free meter move through the applies (it covers the meter, not the network charges), and remember that on one documented kitchen extension the meter saga stretched past a year from first contact to final payment. Budget the money, but protect the programme.

The tasks, tools and materials this cost covers.

More calculators

Other free tools for this stage of your extension.

Frequently asked questions

How much does it cost to move a gas or electric meter for an extension?

A single meter move a short distance along an external wall usually costs £500 – £2,000. Moving both gas and electric together, with trenching and a fuse box move, typically totals £3,500 – £5,000. Longer diversions and difficult access push the figure higher.

How long does utility meter relocation take?

Allow 10–14 weeks from first contact to the meter being moved. This is an initial planning allowance, not an operator guarantee. Confirm dates with your network operator and energy supplier; complex moves can take longer.

Do I have to move my consumer unit as well?

Often, yes. Network operators usually limit the meter tails to about three metres, so moving the meter frequently drags the fuse box with it (the alternative is a switch fuse beside the meter feeding the board). That adds £500 – £800 for a Part P registered electrician to relocate the board and renew the tails.

What does this estimate leave out?

It covers the network operator charges, trenching, and a consumer unit move. It does not include internal re-routing of gas pipework by a Gas Safe engineer, making good after the trench, or any delay cost if the utilities stall your build programme.

Can I get a meter moved for free?

Rarely for building work. If you have a prepayment meter and are on the Priority Services Register, Citizens Advice says your energy supplier should move the meter for free. That covers the meter only, not the network operator's charges to divert the supply, so ask your supplier before you accept a quote.

Doing the whole extension yourself?

Get the free budget spreadsheet. Every cost category for a UK kitchen extension, with contingency and cost per m² worked out for you.

Get the free spreadsheet

Want the full step-by-step guide, planning through to completion? See the Access Pass