What structural steels do, who specifies them, how to verify your order, and why extension steelwork routinely exceeds initial quotes. Covers cantilevers, cavity width problems, and the ordering failures that delay builds by months.

17 min readUpdated 2026Premium

Your extension walls are a dead weight without steels. Every opening you create, whether it's knocking through to the existing house, spanning across bifold doors, or supporting the ridge of your new roof, needs a steel beam to carry the load that the wall can no longer carry. Get the steelwork right and nobody ever thinks about it again. Get it wrong and you're looking at structural failure, building control refusal, or months of delays while fabricators redesign what should have been specified correctly the first time.

Steelwork is where the money goes, the arguments start, and the programme stalls. On real projects, the steel saga can stretch across 25 or more separate events spanning nearly a year: ordering failures, design changes, cavity width problems, unauthorised material substitutions, and multiple fabricator visits. That's not normal. But it's not unusual either.

Do this first

Your structural engineer's calculations must be finalised before steels can be ordered. Walls must reach lintel height before lintels go in. Order steels as early as possible because fabrication takes 2-6 weeks, and delays here stall everything downstream: roof structure, windows and doors, and your building control inspection.

What this guide covers

  1. 01What Steels Actually Do
  2. 02Steels vs Lintels: Know the Difference
  3. 03Who Does What
  4. 04The Ordering Problem
  5. 05What It Costs
  6. 06The Cavity Width Problem
  7. 07The Cantilever Option
  8. 08The Ridge Beam Question
  9. 09Installation: What Actually Happens
  10. 10Fire Protection
  11. 11Design Changes: The Cost Multiplier
  12. 12Regional Differences
  13. 13The Steel Specification Checklist
  14. 14What Comes Next

Premium content — unlock with an Access Pass

This guide is part of the Kitchen Extension Access Pass. Get full access to every section — from planning through to completion.

Get Access Pass

One-time payment. 24 months access.

Frequently asked questions