Infrastructure for Charging Electric Vehicles
Building regulations introduced in June 2022 requiring electric vehicle charge points to be installed on most new dwellings, dwellings undergoing major renovation that have associated parking, and new non-residential buildings with parking. For domestic extensions the trigger is whether the work creates a new associated parking space; ordinary rear extensions to an existing house do not normally engage Part S, but garage conversions or driveway works that change parking provision can. England-only.
Also known as
Pages where Part S comes up
Part S is in the graph but no published guide currently links to it. As leaves get authored or expanded the cross-link sweep will pick them up here automatically.
Want the full picture?
The buildwiz build guides walk through a UK extension in sequence and link to Part S (and every other Approved Document) at the exact stage it bites. That is usually a more productive way to use this material than reading the document cover to cover.