Approved Document O: Overheating
Building regulations introduced in June 2022 limiting summer overheating in new residential buildings in England. Applies primarily to new dwellings and material change of use to residential, not generally to extensions of existing dwellings. Sets two compliance routes: a simplified method based on glazing area, ventilation openings and shading, or a dynamic thermal modelling method (CIBSE TM59). Building control checks Part O at design stage for in-scope projects.
Also known as
What Part O requires for a home project
The Part O requirements and terms the buildwiz guides rely on, with paragraph references where the document gives one. Check the current edition on gov.uk before you build to it.
Terms explained
- Bespoke large-format aluminium rooflight
- Made-to-order large-format fixed aluminium rooflights supplied by specialist glazing companies. Substantially different from standard Velux pivot windows: installed by the specialist supplier rather than the roofer, cost £10,000-15,000 for large units, 8-16 week lead time. May require 30-minute fire resistance glazing if over escape routes. A documented 55m² kitchen extension in Oxfordshire used two large units from a specialist supplier.
Pages where Part O comes up
None of the buildwiz guides currently reference Part O. New mentions will appear here as more guides are published.
Want the full picture?
The buildwiz build guides walk through a UK extension in sequence and link to Part O (and every other Approved Document) at the exact stage it bites. That is usually a more productive way to use this material than reading the document cover to cover.