Block and Mortar Estimator

Estimate how many blocks, bricks, cement bags, and sand you need for your extension walls -- with a materials cost range.

Free calculator, just enter your email

This calculator is free. Enter your email and confirm it to use it, along with the other free email guides and tools. We'll also email you when we publish a new blog post.

No spam. Unsubscribe anytime.

Estimating masonry for an extension comes down to a handful of per-square-metre figures. For a single-leaf 100mm wall you allow , and for the outer skin of a you add . This estimator takes your wall area, subtracts the doors and windows, and turns those rates into a block count, a brick count, and the bags of cement and sand you need to bed them.

Enter your total wall area (or work it out from perimeter and height), deduct the openings, then pick your block type and whether the wall is single leaf or cavity. The result includes wastage so the order sheet reflects what actually turns up on a pallet, not the theoretical minimum.

Where the per-m² figures come from

The block figure is not a guess. A standard UK block has a face, and once you add a bed and perpend joint the working module becomes 450 by 225mm. That gives just under ten blocks to the square metre, rounded up to for ordering. Brickwork in stretcher bond works the same way and lands at .

Mortar scales with wall area too. A single-leaf block wall uses roughly and in a 1:5 mix. A cavity wall adds a brick outer leaf, and bricks have far more joints per m² than blocks, so the estimator counts that leaf at about twice the block-leaf mortar. It also splits the sand: sharp sand for the mortar below the , where salt resistance matters, and building sand for the more workable mix above it.

Dense below the DPC, lightweight above

Most extension walls mix two block types. Dense concrete blocks go in for the first few courses below the DPC, where strength and moisture resistance count, and lightweight aerated blocks go above for their thermal performance and easier handling. The estimator lets you pick dense only, lightweight only, or a realistic mix of both, which changes which sand it assigns to each part of the wall. Your officer will check that the right block sits in the right place when they inspect the walls and blockwork.

A worked example

Take a single-storey rear extension with 40m² of wall face once you have taken off the bifold and window openings. At the inner leaf needs the block count the estimator shows above, before you add for cuts and breakage. With cavity construction, the default, it layers of facing brick on top for the outer skin.

For mortar on that same wall, the tool works from and for the block leaf, counts the brick leaf at about twice that, and adds the same wastage allowance. Remember these are materials figures only. A to lay them sits on top, and on a full extension that labour bill usually runs higher than the blocks and mortar combined.

The tasks, tools and materials this cost covers.

More calculators

Other free tools for this stage of your extension.

Frequently asked questions

How many concrete blocks do I need per m²?

Allow 10 blocks/m² of single-leaf wall face. That figure comes from the 440 × 215mm block plus a 10mm mortar joint in each direction, which makes a tidy 450 by 225mm working module. Add 10% on top when you order to cover cuts and breakage.

How many bricks per m² for a cavity wall outer leaf?

Allow 60 bricks/m² for the outer brick skin laid in stretcher bond. The estimator only counts bricks when you choose cavity wall construction, because a single-leaf wall has no brick outer leaf.

How much cement and sand does blockwork use?

Budget around 0.14 bags/m² and 19 kg/m² for a single-leaf wall bedded at a 10mm joint, before wastage. For a cavity wall the brick outer leaf has far more joints per m² and beds about twice the mortar of the block leaf, so allow roughly three times the single-leaf figures.

How much wastage should I add when ordering blocks and mortar?

The estimator builds in 10% across blocks, bricks, cement, and sand. For walls with many corners, curves, or window reveals, push that higher when you place the order. Running short triggers a separate small delivery that costs more than the extra materials.

Does this estimate include the bricklayer's labour?

No. These are materials-only quantities. A skilled £200 – £300 per day sits on top, and on a full extension the labour to lay the walls often costs more than the blocks and mortar themselves.

Doing the whole extension yourself?

Get the free budget spreadsheet. Every cost category for a UK kitchen extension, with contingency and cost per m² worked out for you.

Get the free spreadsheet

Want the full step-by-step guide, planning through to completion? See the Access Pass